Home / Knowledge
Method, sectors and the thinking behind how we get floors in where others can't.
Screed or structural topping? What the drawings must answer before you price a precast plank deck, from a contractor that installs both. Nationwide.
Read more InsightsHow to fit a school floor screed into a six week holiday window: drying time, system choice and term-time phasing, from directly employed teams.
Read more InsightsWhat changes when the screed goes on beam and block or hollowcore: camber, joints, depth from survey and reaching upper floors without a crane.
Read more InsightsWhere the screed sits in a precast frame programme: deck readiness, crane independence, drying dates and clean handback to follow-on trades.
Read more Plant and CapabilityTrent runs two of the only three track-mounted concrete placing booms in the UK. What they are, why so few exist, and what they change on your pour.
Read more Concrete FoundationsBattery storage, substations and inverter stations all sit on engineered concrete. What main contractors and developers should look for in a concrete partner.
Read more screedSelf-compacting screed or power floated concrete? A practical guide to choosing the right system for your structure, finish and floor use.
Read more