In-situ concrete flooring
High-performance floors, laid to last. Ground-bearing and suspended slabs, power floated finishes, large pours and external hardstandings, engineered to the flatness and strength your project demands.
The work
We install in-situ concrete flooring across industrial, logistics, healthcare, data centre, waste and secure projects, from single pours to phased programmes on live sites. Project values run from around £15,000 to £2m and beyond.
Every floor is set out, poured and finished by our own teams, then tested against the specified flatness and strength so there are no surprises at handover. Nothing is subcontracted. The crew that places the concrete is the crew that finishes it, which is the only reliable way to hit a tolerance on a surface that has a two hour finishing window.
Proof, not promises. You get the survey results, the cube results and the pour records, not an assurance that it went well.
On site
An in-situ concrete slab placed by Trent inside Catesby Tunnel.
Systems
Four systems cover almost everything, and choosing between them is mostly a question of what the floor does for a living.
The default for industrial buildings. The structural slab is placed and its surface densified by float blades as the concrete stiffens, a hard, dense finish in one operation for any floor where wheeled traffic runs directly on the concrete.
Read moreServiceSame finished product, placed differently. Laser screed plant levels concrete in a single controlled pass, which gives you area and tolerance together where the programme is short and the slab is big.
Read moreServiceExternal slabs. Yards, service areas, lorry parks, plant bases and tipping areas, designed for HGV loads, abrasion and weather, and laid to falls so water goes to the drainage rather than sitting on the slab.
Read moreServiceNot a concrete floor at all. A screed is a levelling layer laid over a base or a structural deck; an in-situ concrete floor is the structural slab itself. If the drawings show a deck with a topping over it, you want a screed.
Read moreScoping
If you are pricing this, these are the questions that move the number.
Standards
Floor specifications in the UK normally point at the Concrete Society's Technical Report 34, currently in its 4th edition. TR34 controls flatness and levelness separately: Property E for levelness and Property F for flatness. The specification names the class, and the finished floor is surveyed against it.
The class follows the use: general warehousing sits at one level, high-bay and very tight-tolerance work at another. Where trucks run fixed routes in very narrow aisles, a defined movement specification applies instead and the floor is surveyed differently.
Screeds are a separate standard. Surface regularity for screeds is specified to BS 8204, measured as the maximum deviation under a 2m straightedge.

Capability
Everything is done by our own operatives with our own plant. That is not a slogan, it is the reason the tolerances hold.
Our plant includes a Somero S22EZ laser screed for large area placing, ride-on and walk-behind power floats, our own concrete line pumps, and our own track-mounted placing booms, rare kit in this country. The booms are what let us reach upper decks and restricted spaces that other subcontractors cannot get to, which is how we end up on the projects other people turn down.
We take on the floors others won't. More on the company and the plant at about Trent.
Delivery
Output depends on the system, the grade and the site, so we programme from the finishing window backwards, because on a concrete floor the finish is the constraint rather than the delivery schedule. Then we give you the honest duration. If the programme handed to us does not work, you hear it at tender.
Buildings that keep operating while we work. Phasing, access windows, agreed routes, noise and dust control, and a method statement written around the operation rather than against it.
Where ready-mix cannot reach the pour, our line pumps and placing booms will. Reach is a capability, not an add-on, and it is planned into the works from the start.
Hospitals, schools and operational facilities where the working day belongs to somebody else. Clean methods, out-of-hours windows where needed, and honest programming.
Floors delivered in sections around other trades, with joints and pour sequence designed to suit the phasing rather than fighting it.
Proof
We are Constructionline Gold registered, Avetta and SSIP accredited, and a member of the Nuclear Industry Association. We work for Tier 1 main contractors including VINCI, McLaren, Costain, Kier, Interclass, Tomlinson, SMD, Actavo, Tarmac and Veolia.
If you tender flooring projects regularly, how we work with main contractors sets out what we commit to and what you get.
FAQs
Send us the drawings and the specification, and we'll tell you straight whether we can deliver it, and how.