The challenge
The facility had to keep operating throughout, with constant heavy vehicle movements and demanding load and abrasion requirements on the new surfaces.
Our approach
We engineered the floor and hardstanding build-up for the duty and phased the works around continuous operations to keep the site running.
The outcome
Trent delivered durable, heavy-duty surfaces fit for the demands of a live waste transfer operation, without halting the facility.