The challenge
Installing screed inside a working hospital meant the method had to be fast, clean and phased carefully around clinical activity, with strict control of disruption, noise and access.
Our approach
We used a pumped flowing screed to cover the area quickly and to a flat, consistent finish, planning boom positions and pour sequence around the building's operation and access routes.
The outcome
The floor was delivered to programme and specification with minimal disruption to the hospital, demonstrating Trent's capability in live healthcare environments.