In construction, hardstanding is any hard, load-bearing external surface built to carry vehicles, plant or stored materials without rutting, sinking or breaking up. On commercial sites it usually means an engineered concrete slab laid on a compacted sub-base, designed for the heaviest loads the area will see.
The term covers everything from a lorry park to the base under a generator. What they have in common is that they sit outside, carry heavy and often badly behaved loads, and have to shed water. This guide explains the main types, how a concrete hardstanding is built, and what decides its thickness.
The material is chosen for the loading, the life expected of the surface and the budget.
| Type | Best suited to | Watch out for |
|---|---|---|
| Concrete | The heaviest and most concentrated loads, long design life, low maintenance | Joint layout, falls and curing have to be designed, not improvised |
| Asphalt | Roads and car parks with moving traffic, quick to lay and repair | Softer under standing point loads such as trailer legs, plant outriggers and stacked materials |
| Block paving | Lighter traffic and areas that will be dug up and reinstated | Settlement and rutting where heavy vehicles turn |
| Compacted aggregate | Temporary compounds and low-cost storage | Ruts, dust and potholes under regular heavy traffic |
For a commercial yard that takes HGVs and plant every day, concrete is the usual answer, because it spreads point loads and keeps its shape for decades if it is designed properly.
There is no single figure. Thickness comes from the loading and the ground, and on a commercial job it is set by the engineer. The Britpave Concrete Hardstanding Design Handbook is the usual reference for external concrete hardstandings in the UK.
The questions that drive it are the heaviest vehicle that will really use the area, the worst-case point loads from trailer legs and plant outriggers, and the strength of the ground underneath. The concrete slabs we lay are typically 150 to 250mm thick, sometimes much thicker, with steel or fibre reinforcement to suit the design.
Most failures trace back to one of three things:
An external hardstanding and an internal industrial floor are different problems, even when they are priced on the same project. A warehouse floor is judged on flatness under forklifts on predictable routes. A yard is judged on durability under turning HGVs, weather and point loads, and nobody surveys it for flatness. The detail is on our concrete hardstanding page, and internal floors are covered under industrial concrete flooring.
Trent Construction Services builds heavy-duty external concrete hardstandings for main contractors and commercial clients across the UK: yards, service areas, lorry parks and plant bases. We typically lay 250 to 500m² a day in long strips, with our own operatives and our own plant, including concrete line pumps where the pour face cannot be reached directly. We work on commercial projects only.