A power float finish is the dense, smooth surface produced by working a freshly placed concrete slab with a power float, a machine with rotating pans or blades, as the concrete stiffens. It is the standard finish for industrial floors because it turns the structural slab into a hard-wearing working surface in one operation.
People often ask what tolerance a power float finish achieves. The short answer is that the float decides the surface, not the flatness. Flatness is specified separately, usually to TR34 for industrial floors, and it is mostly set by how the concrete is placed and levelled before the float ever touches it. This guide explains how power floating is done, how the tolerances work and how to specify it.
Timing is everything. Float too early and bleed water is sealed under the surface, which can lead to blistering or delamination. Float too late and the concrete has gone off and will not close.
For industrial floors the tolerance is a flatness class from the Concrete Society's Technical Report 34 (TR34), now in its 4th edition. TR34 controls levelness (Property E) and flatness (Property F) separately, and compliance is assessed on the 95th percentile value. For free movement floors, where trucks can travel anywhere, the classes are:
| Class | Property E (levelness) | Property F (flatness) | Typically specified for |
|---|---|---|---|
| FM1 | 4.5mm | 1.8mm | Reach trucks above 13m without side-shift |
| FM2 | 6.5mm | 2.0mm | Reach trucks 8m to 13m without side-shift |
| FM3 | 8.0mm | 2.2mm | Reach trucks up to 8m, or 13m with side-shift |
| FM4 | 10.0mm | 2.4mm | Workshops with lift heights up to 4m, retail with applied screeds |
The racking and the trucks decide the class the floor needs. FM2 is typical on our laser screeded warehouse floors, and smaller floors laid by hand in large bays typically reach FM3 or FM4.
Screeds are a different standard. Surface regularity for screeds is specified to BS 8204 as SR1, SR2 or SR3, which is 3mm, 5mm or 10mm maximum deviation under a 2m straightedge. If the drawings show a levelling layer over a deck rather than a structural slab, see commercial floor screeds.
A specification that prices cleanly names these things:
Power floating suits any floor where the slab is the working surface and takes wheeled traffic. It is the wrong choice where the floor is a levelling layer over a structural deck (you want a screed), where access or working hours make it impossible to have finishing crews on the slab at the right moment (a self-compacting system removes that constraint, see self-compacting versus power floated), and where the floor will be covered and only needs to be flat, not hard.
Trent Construction Services lays power floated concrete floors for main contractors across the UK, finished to the TR34 class your specification names, with our own operatives, ride-on and walk-behind power floats and a Somero S22EZ laser screed. The finished floor is surveyed by an independent specialist, usually arranged and paid for by us. We work on commercial projects only.