On site
Heavy-duty flooring and hardstanding for a live waste transfer facility handling continuous heavy traffic.
Case study
The facility had to keep operating throughout, with constant heavy vehicle movements and demanding load and abrasion requirements on the new surfaces.
We engineered the floor and hardstanding build-up for the duty and phased the works around continuous operations to keep the site running.
Trent delivered durable, heavy-duty surfaces fit for the demands of a live waste transfer operation, without halting the facility.
Send us the drawings and the specification, and we'll tell you straight whether we can deliver it, and how.
Discuss your project