Home  /  Main contractors

For main contractors

A subcontractor that protects your programme.

Tier 1 contractors work with Trent because the floor goes in when we said it would, to the grade the specification demands, with the paperwork done properly.

Why Trent

Built to make your job easier.

When you put a flooring or screeding project out to tender, you are buying certainty as much as concrete. A floor that slips, fails its grade or causes a clash costs you far more than the project is worth.

Trent is set up to remove that risk, with self-delivery, honest programming and method built around the realities of your site.

  • Programme certainty. Realistic durations, honest reporting, no surprises at handover.
  • RAMS done right. Method statements and phasing built around live-site constraints.
  • Self-delivery. Our own operatives, plant and placing booms, start to finish.
  • Rare reach. Track-mounted placing booms, two of only three in the country, plus Somero laserscreed and our own line pumps.
  • Specified grades, evidenced. Flatness and strength tested and documented to specification.
  • Restricted access. Set up for tight windows, height and live operational sites.
  • Straight talk. If we can't hit something, we tell you early, not late.

Accredited and certified

Constructionline Gold Member Avetta accredited SSIP member Proud member of the Nuclear Industry Association

Got a flooring or screed project coming up?

Send us the drawings and the specification, and we'll tell you straight whether we can deliver it, and how.

Discuss your project